Yinson Production Ghana Ltd. has contracted Seaweld to fabricate Riser Protection frames for Ghana’s third FPSO, the “Yinson Genesis,” which will be located in the Offshore Cape Three Points (OCTP) block, located in the Tano Basin. The scope of the project comprises of the; supply, fabrication, inspection, testing & delivery of pipe works; port and starboard side riser protection frames.
This will be delivered in the following segments;